FLOOR PLAN

vamsigroups

LOCATION MAP

vamsigroups

Project Highlights

vamsigroups
vamsigroups

Cost Details

  • 3.03 cents 850 sqft price: 24,00,000/-
  • Extra construction sqft price: 1800/- per sqft

Description

We have a independent house available for sale at Srinivasam Homes, Kurnool - Ongole Main Rd. Very premium location and excellent deal. with East facing, more information, visit the property.


Additional Details

  • Transaction Type: sale
  • Built In 2018
  • Parking Covered Parking
  • Gated Community Yes
  • Facing East Facing
  • Flooring Vitrified

Project Heighlights

  • Entrance Arch
  • Underground Electricity System
  • 40’ Black Top Roads
  • Underground Drainage
  • Street Lighting
  • Master Compound Wall
  • Children’s Park
  • Protected under CCTV Survelliance
  • Specifications

    EARTH WORK EXCAVATION

    Earth work excavation in Regular soil Soil upto hard level and depositing the excavated earth around the building. The average depth of the foundation is upto hard soil from the natural ground level.

    FOUNDATION CONCRETE

    Cement concrete (1:5:10) prop., using 40 mm size H.B metal is used for columns, Napa or Taki metal used for masonary walls. The average depth of concrete is 0.30. m (1’.0”) below the colulmns and masonry walls, with curing.

    R.R.MASONARY

    For foundation and basement in cm (1:8) prop. With Taki or Napa Stone with curing (Wall width 1’.3”)

    PLASTERING

    Walls plastering with cement mortar (1:5) prop 20mm thick single coat ofmedium Sponz finish with curing of 7 days. Ceiling plastering with cement mortar (1:4) prop 12mm thick single coat of medium sponz finish with curing of 7 days .

    HARDWARE MATERIALS

    All the Hardware materials such as Aldrops + Hinges + Tower bolts are used for doors and windows are quality ISI material M.S. Based and alluminium and Brass.

    COLOURING

    1.Colour wash for internal faces of all walls with Distemper of two coats over primer coat (Asian, Berger) over birla care putty.
    2.Indocem cement colours for external walls.
    3.For wood and grill work enamel paints 2 coats over a primer coat & FF with Polish.

    ELECTRIFICATION

    Electrical fittings over Standard quality switchboards, switches (Anchor & Goldmedal), and distribution panels, concealed wiring with standard ISI make, only points will be provided without fixtures.

    DOOR, WINDOWS & VENTILATORS SIZES

    1. Main Door - 4’ x 7’
    2. Common Doors - 3’ x 7’
    3Toilet Doors - 2’6’’ x 7’
    4.Windows - 4’ x 4’
    5. Ventilators for toilets - 3’ x 1’6’’

    WATER SUPPLY AND SANITARY LINES

    20 MM (3/4’) P.V.C. blue pipes water supply from the main line, 12 mm (1/2”) GI ‘A’ Class pipes for bathrooms and P.V.C 100 mm (4”) for sanitary lines and 50 mm (2”) for bath rooms will be provided.

    WOOD WORKS

    A. Main Door for Office Room in Ground Floor:
    i. Frame :-Teak Wood
    ii. Shutter :- Teak Wood
    B. Internal Doors:
    C. Ventilators:
    i. Frame :- UPVC
    ii. Shutter :- UPVC

    SUPER STRUCTURE

    All external walls are 0.203 m (8”) thick with Nandyal Medium brick internal walls 0.10 m (4” thick with Nandyal Medium brick in cement mortar (1:6) prop. and parapet wall with 0.101 m (4”) thick of Nandyal Medium brick in cement mortar (1:6) prop. of 0.91 m (3’.0”) height. Building Plint Area is _______ sft. Rate per sft is Rs. _______/- (Rupees ____________ only) i.e Total Cost of Building is Rs. ________________/- (Rupees _________________________ ___________________________only).

    TOILET

    1.Glazed ceramic tiles 8’ x 6’ upto 6’.0” height, flooring with ceramic tiles.
    2.Sanitary fittings of Gujarat make with Indian and another European.
    3.Medium size washbasin in white / any colour.
    4.Hot water, cold water, C.P. Taps quality provided.